The requirements imposed on a flooring system depend on the purpose of the building and its areas, such as reception, common spaces, offices, data centres, stairs or technical rooms. In building refurbishment operations, we are at the service of real estate and direct customers who intend to start redevelopment or functional conversion of offices and public environments About flooring, we work with designers, technical management and the customer to enhance and reuse the building’s heritage, proposing sustainable and customised solutions that ensure maximum performance and functionality.

If required, we have solutions for public areas that meet the anti-slip requirements of DIN 51130 up to category R10: these are more resistant solutions thanks to the silica and carbide aggregates in the mix, which give a rougher surface.


We are PVC solution applicators:

soluzione tecnica PVC Eterogeneo - ufficio

Acoustic comfort

Nonslip

Fire reaction Bfl-s1

icona materiale riciclato

Recycled and Recyclable

icona UV resistente

UV resistant

icona antigraffio

Scratch-resistant surface

VOC free

Eco-friendly

LEED Credits

More on this

PVC Tarkett antistatico per CED e locali tecnici

In environments such as data centres or IT and electronics companies, electrostatic discharges can cause serious damage in areas with sensitive electronic equipment.
These special areas require conductive and static-dissipative flooring to quickly eliminate electrostatic discharges.

PVC Tarkett per magazzino ufficio

When designing warehouses and storage facilities, especially
for heavy equipment.It is important that the floors are wear-resistant. These areas of intense activity require particularly durable solutions that can withstand scratches and residual marks.

Where

  • Headquarters
  • Public offices
  • Corporate offices
  • Coworking areas
  • Representative offices
  • Open offices

WORKPLACE AREAS

  • Reception area
  • Executive offices
  • Standard offices
  • Open offices
  • Coworking area
  • Meeting area
  • Conference room
  • Boardroom
  • Corridors, stairs
  • Canteen
  • Toilets
  • Technical rooms
  • Multi-storey car park
  • Outdoor